Pertamina RDMP — Balikpapan Refinery
Scope: Full HVAC installation (units, ducting, drainage, refrigerant piping, controls) plus plumbing and FM200 fire suppression on Indonesia's largest refinery development.
Duration: 2 years
More than 100 HVAC projects since 2010 — from Indonesia's tallest building to its largest refinery upgrade. Here are the highlights, followed by the full list.
Scope: Full HVAC installation (units, ducting, drainage, refrigerant piping, controls) plus plumbing and FM200 fire suppression on Indonesia's largest refinery development.
Duration: 2 years
Scope: Installation of 4 × 1,650 TR + 1 × 600 TR chiller plant with 900 mm headers — the biggest chiller units in Indonesia, inside the country's tallest building.
Scope: Chiller plant installation plus complete piping and ducting distribution across all 27 storeys.
Duration: 6 months
Scope: Full EPC of air-cooled HVAC systems — design, supply and installation of chiller plant, AHUs, control panels, ducting and wiring.
Duration: 12 months
Scope: Relocation of 2 × 250 TR + 2 × 300 TR chillers with 700 m of piping — completed in 3 months with only one day of production downtime.
On EPC projects we also deliver related building systems: FM200 clean-agent fire suppression and complete plumbing packages, installed and tested by the same accountable team.
Selected references from 2010 to today. ME contractor / main contractor shown where applicable.
Whatever the building type — mall, hospital, factory, data center or tower — we've likely built its HVAC system before.