Project List
On Going Projects
![bicc1 bicc1](https://sonducts.com/wp-content/uploads/2021/02/bicc1.jpg)
Bandung International Convention Center
Chiller plant contractor
![Ducting krakatau steel 2 Ducting krakatau steel 2](https://sonducts.com/wp-content/uploads/2021/03/Ducting-krakatau-steel-2.jpg)
Pertamina JTB
Supply ducting and accesories
![thamrin9 1 thamrin9 1](https://sonducts.com/wp-content/uploads/2021/02/thamrin9-1.jpg)
Thamrin Nine Tower
Chiller plant contractor. The biggest chiller for the tallest building in Indonesia.
Finished Projects
![ks1 ks1](https://sonducts.com/wp-content/uploads/2021/02/ks1.jpg)
Krakatau Steel HSM 2 (Chiller)
Design and Build (EPC) of Air Cooled Chiller Systems. Includes Air Cooled Chiller, pump, control panels, and ducting.
![Ducting krakatau steel bjls Ducting krakatau steel bjls](https://sonducts.com/wp-content/uploads/2021/03/Ducting-krakatau-steel-bjls.jpg)
Krakatau Steel HSM 2 (Ducting)
Design and Build (EPC) of Air Cooled Chiller Systems. Includes Air Cooled Chiller, pump, control panels, and ducting.
![wika tower wika tower](https://sonducts.com/wp-content/uploads/2021/03/wika-tower.jpg)
Wika Tower 2
Instalation of aircon units, ducting, piping and aircon drainage.
![transmartbogor1 transmartbogor1](https://sonducts.com/wp-content/uploads/2021/02/transmartbogor1.jpg)
Transmart Bogor
Water Cooled Chiller Contractor. Includes piping and ducting for the whole shopping malls
![transmartbogor1 transmartbogor1](https://sonducts.com/wp-content/uploads/2021/02/transmartbogor1.jpg)
Transmart Bogor
Water Cooled Chiller Contractor. Includes piping and ducting for the whole shopping malls